To preserve the coal quality and punctuality for coal delivery to the buyers, in 2010, Prima Multi Artha Group took over 100% shares of CV Andhika Jaya, a stockpile and crusher company and change it status to PT Andhika Jaya Perkasa.

PT Andhika Jaya Perkasa holds 2.8 hectares land which can accommodate up to 70,000 MT coal piles and 9 hectares land with 300,000 MT coal piles capacity.  Both stockpiles located in Km.94, Binuang, Tapin Regency, South Kalimantan.

Located in a strategic place between the coal center of Tapin Regency and HJU Port in Sei Salai and Sei Putting, nowadays PT Andhika Jaya Perkasa focused on coal processing plant which equipped with large capacity of crushers, whell loader machines, and a dump truck fleet that available to carry coals from stockpile to the port with the ability of 15,000 MT per day.

 

 

AJP 1

Land Size 2.8 Hectares

Stockpile Capacity up to 70.000 MT

1 unit Crusher with speed @250 MT/hour

Production Capacity up to 3.000 MT per day

Machinery: 2 unit Wheel Loader WA-500

2 unit Excavator PC 200-8

 

AJP2

Land Size 9 Hectares

Stockpile Capacity up to 300.000 MT

2 units Crusher with speed @500 MT/hour

Production Capacity up to 12.000 MT per day

Machinery: 4 unit Wheel Loader WA-500

2 unit Excavator PC 200-8

 

ATS

Land Size 15 Hectares

Stockpile Capacity up to 300.000 MT

1 unit Crusher with speed @300 MT/hour

Production Capacity up to 4.000 MT per day

Machinery: 4 unit Wheel Loader WA-500

2 unit Excavator PC 200-8

1 unit Excavator PC 300-8

To support the facility in stockpile, PT Andhika Jaya Perkasa (AJP) is equipped with 158 units of dump truck which are used to deliver the coal from stockpile to JT port or from the coal mine to stockpile.

 
PRIMA MULTI ARTHA GROUP.